ECO5 Scheme Details: Policy, Funding & Technical Guide

Updated
ECO5 launches April 2026 with £5B+ funding. Key changes: 40% allocation to heat pumps, carbon-weighted scoring, 100,000+ customer threshold for suppliers, and enhanced Ofgem compliance. This guide covers policy framework, technical specifications, and regulatory requirements.

31 Dec 2026
ECO4 end date
Ofgem
ECO4
Scheme open to applications now
Ofgem
Warm Homes Plan
Announced successor to ECO
GOV.UK, March 2026
EPC D–G
Property rating for ECO4
Ofgem
Policy Framework & Legislation
Understanding the legal and regulatory foundation of ECO5.
Primary Legislation
Energy Act 2023 provisions for ECO5
ECO5 operates under the Energy Act 2023, which grants DESNZ powers to set supplier obligations for domestic energy efficiency improvements. The scheme aligns with the Climate Change Act 2008 and Net Zero Strategy.
Secondary Legislation
ECO5 Order (expected Q4 2025)
The Electricity and Gas (Energy Company Obligation) Order will set out detailed rules for ECO5, including supplier thresholds, measure requirements, and delivery deadlines. Expected Royal Assent late 2025.
Regulatory Framework
Ofgem administration and enforcement
Ofgem will administer ECO5, including supplier registration, measure notification, compliance monitoring, and enforcement actions. New digital reporting systems expected for streamlined delivery.
Government Guidance
DESNZ technical and policy guidance
DESNZ will publish comprehensive guidance covering eligibility criteria, measure specifications, installer requirements, and quality assurance. Consultation expected Q3 2025.
Official guidance will be published on GOV.UK Energy Company Obligation
Funding Allocation & Budget
How ECO5's £5+ billion budget is expected to be distributed across measures.
Primary focus on air and ground source heat pumps for decarbonising heating
Solar panel installations with battery storage systems
Loft, cavity wall, and external wall insulation
Smart heating controls, hybrid systems, and innovation measures
Supplier Obligations
How energy supplier requirements are changing under ECO5.
| Metric | ECO4 (Current) | ECO5 (Expected) | Key Change |
|---|---|---|---|
| Threshold | Large domestic suppliers | 100,000+ customers (expected) | More suppliers included |
| Annual Target | Variable by supplier size | Based on market share + emissions | Carbon-weighted formula |
| Delivery Period | April 2022 - 31 December 2026 | April 2026 - March 2030 | 4-year obligation cycle |
| Penalty Rate | £0.35/credit shortfall | £0.40-0.50/credit (expected) | Increased enforcement |
Technical Requirements by Measure
Detailed specifications and standards for ECO5 eligible measures.
Air Source Heat Pumps
- Minimum COP 3.0 at A7/W35
- MCS certified installation
- Minimum 5-year warranty
- Property must be insulated to minimum standard
- EPC improvement of minimum 2 bands
Solar Panels (PV)
- Minimum 3kWp system size
- MCS certified installation
- Grid-tied with export capability
- Smart meter required
- Battery storage optional add-on
Battery Storage
- Minimum 5kWh capacity
- Must be paired with solar PV
- Smart grid-ready
- 10-year manufacturer warranty
- Recyclable end-of-life
External Wall Insulation
- U-value ≤ 0.30 W/m²K
- PAS 2030:2019 compliant
- Fire safety certified
- 25-year guarantee minimum
- Building regulations approval
PAS 2035 Compliance Required
All ECO5 projects must follow PAS 2035:2019 retrofit assessment framework. This includes a qualified Retrofit Coordinator, comprehensive dwelling assessment, improvement option evaluation, and medium-term improvement plan. Non-compliant installations will not receive ECO5 credits.
ECO5 Scoring Methodology
How measures are valued under the new carbon-weighted credit system.
Carbon Savings
Tonnes of CO2 saved over measure lifetime (typically 15-25 years)
Energy Bill Impact
Estimated annual energy cost savings for the household
Fuel Poverty Uplift
Additional weighting for households in fuel poverty
Innovation Bonus
Bonus credits for innovative or whole-house approaches
Example Credit Calculation
Total Credits = (Carbon Savings × 0.40) + (Bill Savings × 0.25) + (Fuel Poverty Uplift × 0.20) + (Innovation Bonus × 0.15)Example: A heat pump installation saving 2.5 tonnes CO2/year, £450/year on bills, for a fuel-poor household using whole-house approach would receive significantly more credits than a single-measure installation.
Delivery Mechanisms
Direct Delivery
Suppliers engage TrustMark-registered installers directly to deliver measures to eligible households.
Primary RouteLA Flex
Local authorities can refer eligible households who don't receive qualifying benefits but meet local criteria.
Expanded in ECO5Credit Trading
Suppliers can trade ECO credits between obligated parties to meet targets efficiently.
Market MechanismMonitoring & Compliance
Quality Assurance
- 5% minimum post-installation inspections
- Customer satisfaction surveys mandatory
- Defect rectification within 30 days
- Annual installer audits by TrustMark
- Real-time measure notification system
Enforcement
- Financial penalties for non-compliance
- Installer suspension for quality issues
- Public reporting of supplier performance
- Credit recovery for invalid measures
- Criminal prosecution for fraud
Transition from ECO4 to ECO5
- Q3 2025
ECO5 Consultation Published
DESNZ publishes formal consultation on ECO5 policy framework and regulations.
- Q4 2025
Consultation Response & Final Rules
Government response to consultation and final ECO5 Order laid in Parliament.
- January 2026
Supplier Registration Opens
Obligated suppliers register with Ofgem for ECO5 delivery.
- April 2026
ECO5 Scheme Launch
First ECO5 measures can be delivered and notified to Ofgem.
- 2027-2029
Annual Compliance Periods
Yearly supplier compliance checks and target adjustments.
- March 2030
ECO5 Scheme Ends
Final deadline for ECO5 measure delivery and notification.
Don't Wait for ECO5 - Apply for ECO4 Now
If you're eligible for ECO4, we strongly recommend applying now. ECO4 funding remains generous and is available until 31 December 2026. ECO5's exact terms are still being finalised, and waiting could mean missing out on current support.
Check ECO4 EligibilityFrequently Asked Questions
What is the expected total budget for ECO5?
ECO5 is expected to have a total budget of £5 billion or more over the 4-year period (2026-2030). This represents a significant increase from ECO4's £4 billion budget, reflecting the greater cost of heat pump and renewable installations compared to traditional boiler replacements.
How will ECO5 supplier obligations be calculated?
ECO5 supplier obligations will likely be calculated using a carbon-weighted formula based on market share and customer emissions profiles. Suppliers with more than 100,000 domestic customers (down from 150,000 in ECO4) are expected to be obligated, with targets proportional to their share of the domestic energy market.
What technical standards must ECO5 measures meet?
ECO5 measures must meet PAS 2035/2030:2019 standards for retrofit assessment and installation. Heat pumps require MCS certification with minimum COP of 3.0. Insulation must achieve specified U-values (e.g., ≤0.30 W/m²K for EWI). All measures need TrustMark registration and appropriate warranties (5-25 years depending on measure type).
How does ECO5 scoring differ from ECO4?
ECO5 scoring will place greater emphasis on carbon savings (40% weight) rather than just energy bill reduction. A new fuel poverty uplift provides additional credits for vulnerable households. Innovation bonuses reward whole-house approaches and cutting-edge technologies. The carbon credit system replaces the current cost/benefit calculation.
What role will Ofgem play in ECO5 administration?
Ofgem will continue as ECO5 administrator, responsible for: supplier registration and threshold determination, measure notification and verification, compliance monitoring and enforcement, annual target setting and adjustment, penalty administration for non-compliance, and data publication and transparency.
How will ECO5 interact with other schemes like GBIS and BUS?
ECO5 will operate alongside the Great British Insulation Scheme (GBIS) and Boiler Upgrade Scheme (BUS). Households may be eligible for multiple schemes but cannot receive duplicate funding for the same measure. A new 'scheme stacking' framework will allow complementary measures from different schemes on the same property.
What quality assurance requirements apply to ECO5?
ECO5 requires: PAS 2035 retrofit coordinator assessment for all projects, TrustMark-registered installers only, post-installation inspections (minimum 5% of all jobs), customer satisfaction surveys, defect rectification protocols, and enhanced warranty requirements. Ofgem can suspend installers with quality issues.
What happens to ECO4 projects during the transition?
ECO4 measures installed before April 2026 will be credited under ECO4 rules. A transition period (expected 3 months) will allow suppliers to complete in-progress installations. Measures started under ECO4 but completed after April 2026 may be notified under either scheme, subject to verification.
Will ECO5 include smart meter requirements?
Yes, ECO5 will likely require smart meters for certain measures, particularly solar PV installations and smart heating controls. This enables better monitoring of energy savings and supports grid flexibility. Suppliers may receive bonus credits for measures linked to smart meter data.
How will ECO5 address hard-to-treat properties?
ECO5 includes specific provisions for hard-to-treat properties: enhanced funding for solid wall and off-gas properties, innovation measures for heritage and listed buildings, flexibility in EPC improvement requirements where technically limited, and dedicated budget allocation for rural and remote areas.
Check If You Qualify
Four quick steps. Tap your answers and we'll do the rest.
Ready to Start Saving?
See if your household qualifies for funded ECO4 heating upgrades through the ECO4 scheme.
- 100%
- Free Service
- 60s
- Application
- ECO4
- Eligibility check

