ECO5 Scheme Details: Policy, Funding & Technical Guide

Free Boiler Upgrade UK logo

By Free Boiler Upgrade

Updated

ECO5 launches April 2026 with £5B+ funding. Key changes: 40% allocation to heat pumps, carbon-weighted scoring, 100,000+ customer threshold for suppliers, and enhanced Ofgem compliance. This guide covers policy framework, technical specifications, and regulatory requirements.

Blank fingerpost at a country crossroads pointing in several directions

31 Dec 2026

ECO4 end date

Ofgem

ECO4

Scheme open to applications now

Ofgem

Warm Homes Plan

Announced successor to ECO

GOV.UK, March 2026

EPC D–G

Property rating for ECO4

Ofgem

Legislative Basis

Policy Framework & Legislation

Understanding the legal and regulatory foundation of ECO5.

Primary Legislation

Energy Act 2023 provisions for ECO5

ECO5 operates under the Energy Act 2023, which grants DESNZ powers to set supplier obligations for domestic energy efficiency improvements. The scheme aligns with the Climate Change Act 2008 and Net Zero Strategy.

Secondary Legislation

ECO5 Order (expected Q4 2025)

The Electricity and Gas (Energy Company Obligation) Order will set out detailed rules for ECO5, including supplier thresholds, measure requirements, and delivery deadlines. Expected Royal Assent late 2025.

Regulatory Framework

Ofgem administration and enforcement

Ofgem will administer ECO5, including supplier registration, measure notification, compliance monitoring, and enforcement actions. New digital reporting systems expected for streamlined delivery.

Government Guidance

DESNZ technical and policy guidance

DESNZ will publish comprehensive guidance covering eligibility criteria, measure specifications, installer requirements, and quality assurance. Consultation expected Q3 2025.

Official guidance will be published on GOV.UK Energy Company Obligation

£5B+ Budget

Funding Allocation & Budget

How ECO5's £5+ billion budget is expected to be distributed across measures.

Heat Pumps (ASHP/GSHP)
£2.0B+40%

Primary focus on air and ground source heat pumps for decarbonising heating

Solar PV & Battery
£1.0B+20%

Solar panel installations with battery storage systems

Insulation Measures
£1.25B+25%

Loft, cavity wall, and external wall insulation

Smart Controls & Other
£0.75B+15%

Smart heating controls, hybrid systems, and innovation measures

Total ECO5 Budget (2026-2030)£5.0B+
£4.0B
ECO4 Budget
2022-2026
£5.0B+
ECO5 Budget
2026-2030
+25%
Budget Increase
Heat pump focus
Energy Suppliers

Supplier Obligations

How energy supplier requirements are changing under ECO5.

ECO4 supplier obligations compared with expected ECO5 changes
MetricECO4 (Current)ECO5 (Expected)Key Change
ThresholdLarge domestic suppliers100,000+ customers (expected)More suppliers included
Annual TargetVariable by supplier sizeBased on market share + emissionsCarbon-weighted formula
Delivery PeriodApril 2022 - 31 December 2026April 2026 - March 20304-year obligation cycle
Penalty Rate£0.35/credit shortfall£0.40-0.50/credit (expected)Increased enforcement
Specifications

Technical Requirements by Measure

Detailed specifications and standards for ECO5 eligible measures.

Air Source Heat Pumps

Up to £12,000
  • Minimum COP 3.0 at A7/W35
  • MCS certified installation
  • Minimum 5-year warranty
  • Property must be insulated to minimum standard
  • EPC improvement of minimum 2 bands

Solar Panels (PV)

up to £7000
  • Minimum 3kWp system size
  • MCS certified installation
  • Grid-tied with export capability
  • Smart meter required
  • Battery storage optional add-on

Battery Storage

Up to £3,000
  • Minimum 5kWh capacity
  • Must be paired with solar PV
  • Smart grid-ready
  • 10-year manufacturer warranty
  • Recyclable end-of-life

External Wall Insulation

Up to £15,000
  • U-value ≤ 0.30 W/m²K
  • PAS 2030:2019 compliant
  • Fire safety certified
  • 25-year guarantee minimum
  • Building regulations approval

PAS 2035 Compliance Required

All ECO5 projects must follow PAS 2035:2019 retrofit assessment framework. This includes a qualified Retrofit Coordinator, comprehensive dwelling assessment, improvement option evaluation, and medium-term improvement plan. Non-compliant installations will not receive ECO5 credits.

Credit Calculation

ECO5 Scoring Methodology

How measures are valued under the new carbon-weighted credit system.

40%

Carbon Savings

Tonnes of CO2 saved over measure lifetime (typically 15-25 years)

25%

Energy Bill Impact

Estimated annual energy cost savings for the household

20%

Fuel Poverty Uplift

Additional weighting for households in fuel poverty

15%

Innovation Bonus

Bonus credits for innovative or whole-house approaches

Example Credit Calculation

Total Credits = (Carbon Savings × 0.40) + (Bill Savings × 0.25) + (Fuel Poverty Uplift × 0.20) + (Innovation Bonus × 0.15)

Example: A heat pump installation saving 2.5 tonnes CO2/year, £450/year on bills, for a fuel-poor household using whole-house approach would receive significantly more credits than a single-measure installation.

Implementation

Delivery Mechanisms

Direct Delivery

Suppliers engage TrustMark-registered installers directly to deliver measures to eligible households.

Primary Route

LA Flex

Local authorities can refer eligible households who don't receive qualifying benefits but meet local criteria.

Expanded in ECO5

Credit Trading

Suppliers can trade ECO credits between obligated parties to meet targets efficiently.

Market Mechanism
Ofgem Oversight

Monitoring & Compliance

Quality Assurance

  • 5% minimum post-installation inspections
  • Customer satisfaction surveys mandatory
  • Defect rectification within 30 days
  • Annual installer audits by TrustMark
  • Real-time measure notification system

Enforcement

  • Financial penalties for non-compliance
  • Installer suspension for quality issues
  • Public reporting of supplier performance
  • Credit recovery for invalid measures
  • Criminal prosecution for fraud
Transition Period

Transition from ECO4 to ECO5

  1. Q3 2025

    ECO5 Consultation Published

    DESNZ publishes formal consultation on ECO5 policy framework and regulations.

  2. Q4 2025

    Consultation Response & Final Rules

    Government response to consultation and final ECO5 Order laid in Parliament.

  3. January 2026

    Supplier Registration Opens

    Obligated suppliers register with Ofgem for ECO5 delivery.

  4. April 2026

    ECO5 Scheme Launch

    First ECO5 measures can be delivered and notified to Ofgem.

  5. 2027-2029

    Annual Compliance Periods

    Yearly supplier compliance checks and target adjustments.

  6. March 2030

    ECO5 Scheme Ends

    Final deadline for ECO5 measure delivery and notification.

Don't Wait for ECO5 - Apply for ECO4 Now

If you're eligible for ECO4, we strongly recommend applying now. ECO4 funding remains generous and is available until 31 December 2026. ECO5's exact terms are still being finalised, and waiting could mean missing out on current support.

Check ECO4 Eligibility
Technical FAQs

Frequently Asked Questions

What is the expected total budget for ECO5?

ECO5 is expected to have a total budget of £5 billion or more over the 4-year period (2026-2030). This represents a significant increase from ECO4's £4 billion budget, reflecting the greater cost of heat pump and renewable installations compared to traditional boiler replacements.

How will ECO5 supplier obligations be calculated?

ECO5 supplier obligations will likely be calculated using a carbon-weighted formula based on market share and customer emissions profiles. Suppliers with more than 100,000 domestic customers (down from 150,000 in ECO4) are expected to be obligated, with targets proportional to their share of the domestic energy market.

What technical standards must ECO5 measures meet?

ECO5 measures must meet PAS 2035/2030:2019 standards for retrofit assessment and installation. Heat pumps require MCS certification with minimum COP of 3.0. Insulation must achieve specified U-values (e.g., ≤0.30 W/m²K for EWI). All measures need TrustMark registration and appropriate warranties (5-25 years depending on measure type).

How does ECO5 scoring differ from ECO4?

ECO5 scoring will place greater emphasis on carbon savings (40% weight) rather than just energy bill reduction. A new fuel poverty uplift provides additional credits for vulnerable households. Innovation bonuses reward whole-house approaches and cutting-edge technologies. The carbon credit system replaces the current cost/benefit calculation.

What role will Ofgem play in ECO5 administration?

Ofgem will continue as ECO5 administrator, responsible for: supplier registration and threshold determination, measure notification and verification, compliance monitoring and enforcement, annual target setting and adjustment, penalty administration for non-compliance, and data publication and transparency.

How will ECO5 interact with other schemes like GBIS and BUS?

ECO5 will operate alongside the Great British Insulation Scheme (GBIS) and Boiler Upgrade Scheme (BUS). Households may be eligible for multiple schemes but cannot receive duplicate funding for the same measure. A new 'scheme stacking' framework will allow complementary measures from different schemes on the same property.

What quality assurance requirements apply to ECO5?

ECO5 requires: PAS 2035 retrofit coordinator assessment for all projects, TrustMark-registered installers only, post-installation inspections (minimum 5% of all jobs), customer satisfaction surveys, defect rectification protocols, and enhanced warranty requirements. Ofgem can suspend installers with quality issues.

What happens to ECO4 projects during the transition?

ECO4 measures installed before April 2026 will be credited under ECO4 rules. A transition period (expected 3 months) will allow suppliers to complete in-progress installations. Measures started under ECO4 but completed after April 2026 may be notified under either scheme, subject to verification.

Will ECO5 include smart meter requirements?

Yes, ECO5 will likely require smart meters for certain measures, particularly solar PV installations and smart heating controls. This enables better monitoring of energy savings and supports grid flexibility. Suppliers may receive bonus credits for measures linked to smart meter data.

How will ECO5 address hard-to-treat properties?

ECO5 includes specific provisions for hard-to-treat properties: enhanced funding for solid wall and off-gas properties, innovation measures for heritage and listed buildings, flexibility in EPC improvement requirements where technically limited, and dedicated budget allocation for rural and remote areas.

Tap, tap, done

Check If You Qualify

Four quick steps. Tap your answers and we'll do the rest.

Ready to Start Saving?

See if your household qualifies for funded ECO4 heating upgrades through the ECO4 scheme.

100%
Free Service
60s
Application
ECO4
Eligibility check