ECO4 Scheme Extended Until March 2026 | 50,000+ Installations
Complete Application Guide

How to Apply for Your Free Boiler Grant

Complete step-by-step guide to applying for the ECO4 free boiler scheme. From eligibility check to installation, we'll walk you through every stage of the process.

3-4 Weeks

Total Process Time

100% Free

No Application Fee

Government Backed

ECO4 Scheme

No Obligation

Free Assessment

7-Step Application Process

Follow our comprehensive step-by-step guide to successfully apply for your free boiler grant through the ECO4 scheme.

Step 1
2-3 minutes

Check Your Eligibility

Use our quick eligibility checker to see if you qualify for the ECO4 scheme.

  • Complete our online eligibility form
  • Provide basic information about your property and circumstances
  • Get instant preliminary results
  • No obligation to proceed further
Start Eligibility Check
Step 2
1-2 hours

Gather Required Documents

Collect all necessary documentation to support your application.

  • Proof of benefits (award letters or bank statements)
  • Photo ID for all household members over 16
  • Proof of address (utility bills or council tax)
  • Property ownership documents or tenancy agreement
  • Current EPC certificate (if available)
Document Checklist
Step 3
10-15 minutes

Submit Full Application

Complete the detailed application form with all required information.

  • Fill out comprehensive application form
  • Upload required documents securely
  • Provide detailed property information
  • Submit application for review
  • Receive application confirmation
Apply Now
Step 4
1-2 hours

Home Survey & Assessment

Technical survey of your property to assess suitability and requirements.

  • Schedule convenient appointment time
  • Qualified surveyor visits your property
  • Assessment of current heating system
  • Property energy efficiency evaluation
  • Recommendations for improvements
Learn About Surveys
Step 5
1-2 weeks

Application Review & Approval

Your application is reviewed and funding approval is confirmed.

  • Application reviewed by funding body
  • Eligibility verification completed
  • Survey results analyzed
  • Funding approval decision made
  • Notification of outcome
Track Application
Step 6
1-2 weeks

Installation Scheduled

Your new boiler installation is scheduled with certified engineers.

  • Installation date arranged
  • Gas Safe registered engineer assigned
  • Pre-installation preparations explained
  • Installation timeline confirmed
  • Contact details provided
Installation Info
Step 7
1 day

Boiler Installation & Handover

Professional installation of your new energy-efficient boiler.

  • Old boiler safely removed
  • New A-rated boiler installed
  • System testing and commissioning
  • Warranty and documentation provided
  • Operation instructions given
Installation Day Guide

Required Documents Checklist

Prepare these documents before starting your application to ensure a smooth and quick process.

Proof of Benefits
  • Universal Credit award letter
  • Pension Credit statement
  • Income Support documentation
  • Housing Benefit award letter
  • Tax Credit award letters
Identity Verification
  • Passport or driving license
  • National Insurance number
  • Birth certificate (if no photo ID)
  • Utility bill as proof of address
Property Documentation
  • Property deeds or mortgage statement
  • Tenancy agreement (for renters)
  • Landlord permission letter
  • Council tax bill
  • Energy Performance Certificate

Application Timeline

Track your application progress with our typical timeline.

1

Application Submission

Day 1

2

Initial Review

Day 2-3

3

Home Survey Scheduled

Day 4-7

4

Survey Completed

Day 8-10

5

Application Assessment

Day 11-14

6

Approval Decision

Day 15

7

Installation Scheduled

Day 16-21

8

Boiler Installation

Day 22-28

Application Process FAQs

How long does the entire application process take?

The complete process typically takes 3-4 weeks from application submission to installation. This includes eligibility verification (3-5 days), home survey scheduling and completion (1-2 weeks), application review (1-2 weeks), and installation scheduling (1 week).

What happens if my application is rejected?

If your application is rejected, we'll explain the reasons and help explore alternative options. You may be eligible for other schemes like GBIS, or we can advise on commercial options. You can also reapply if your circumstances change.

Do I need to be home during the survey?

Yes, an adult (over 18) must be present during the home survey. This allows the surveyor to access all areas of your property, ask relevant questions about your heating system, and explain the assessment process.

Can I choose my preferred installation date?

We'll work with you to find a convenient installation date within the available timeframe. While we can't guarantee specific dates, we offer flexible scheduling including weekends where possible.

What if I don't have all the required documents?

Don't let missing documents stop you from applying. We can help you obtain most required documents, and some can be provided after initial application. Contact our team for guidance on your specific situation.

Ready to Start Your Application?

Now that you understand the process, take the first step towards your free boiler grant. Check your eligibility in just 2 minutes.